Table of Contents

Water purification charge 2025

rate per pollution unit (v.e.) type
€ 81.57commercial space
€ 81.57residential space

Water pollution charge 2025

rate per pollution unit (v.e.) type
€ 81.57commercial space
€ 81.57residential space

Water system charge for residents 2025

ratetype
€ 130.21per housing unit

Water system charge for property owners 2025

rate (% of WOZ value)Type
0.0410%built inside the dikes
0.01025%built outside the dikes

Water system charge on unbuilt land, nature, and roads 2025

rate per hectaretype
€ 92.77undeveloped land inside the dikes
€ 23.19undeveloped land outside the dikes
€ 6.52nature
€ 185.54roads inside the dikes
€ 46.39roads outside the dikes